Horizontal Rapid Doors for Pulp Mill Lifting Openings
A pulp mill moved material vertically through floor openings. Humidity, process vapour and wash water complicated the horizontal door installation, particularly around the guides. SEPPES specified a six-door package with horizontal travel, stainless-steel components and raised mounting bases coordinated with the civil team. The first batch was installed and checked on site.


- Project scope
- 6 custom assemblies
- Travel plane
- Horizontal, at floor level
- Guide mounting
- Raised concrete bases
- Recorded site stage
- First-batch operating checks
Floor-level guides had to work around wash water and lifting activity.
The process opening
Pulp was lifted between levels through openings in the structure. The floor and surrounding plant were exposed to moisture and periodic cleaning. The earlier arrangement put the guides close to floor run-off, which the project account describes as a source of contamination in the guides.
The door and building interface
The new assemblies travelled horizontally over the openings. SEPPES coordinated the guide levels and raised concrete mounting bases with the civil team. The project specification called for stainless-steel components around the guide and head assembly.
Treat the mounting base as part of the door interface.
| Design item | Project configuration | What to confirm at your site |
|---|---|---|
| Horizontal assembly | Rigid slats travelled across the floor opening on horizontal guides. | Show the lifting path, the equipment envelope, door travel and where components can be serviced. |
| Material selection | The project specification called for 304 stainless steel at the enclosure, guide structure and associated hardware. | Share wash-down exposure, expected chemicals, humidity and the maintenance conditions for the offered materials. |
| Civil interface | The civil team was given raised-base details, with a nominal 150–200 mm provision recorded for this project. | Coordinate base levels, drainage and fixing details from the approved site drawing. |
| Opening protection | Separate perimeter guardrails are visible in the site photograph. | Have the responsible project team specify guarding, access controls and any required evidence for the floor opening. |
| Operating scope | The source describes trial operation of the first installed assemblies. | Define installation, testing and acceptance milestones for each batch of a comparable package. |
Coordinate the lifting envelope, cleaning and maintenance access.
Resolve guide location and water paths together
A horizontal guide sits in a different exposure zone from the upright guide of a standard doorway. Review where run-off travels during cleaning, where debris collects and how the guide will be inspected. The raised mounting details in this case were developed alongside civil works for the actual openings.
Give the opening its own structural and access brief
Identify who controls access at each floor, the lifting and load movement envelope and what protection is required when the opening is exposed. Any structural, load or fall-protection duty requires its own approval and supporting engineering information for the specific installation.


Work from surveyed levels and record checks by batch.
Survey the lifting route
Review the floor openings, lifting equipment, surrounding structure and areas exposed to wash water.
Coordinate the civil details
The team provided the raised-base and mounting details so guide positioning could be planned with construction.
Set the first guides and fit the assemblies
The source records initial site installation, alignment and assembly of the first batch.
Check initial operation
The project record describes horizontal movement checks on the initial installations while the wider acceptance process was progressing.
What the project delivered
The first batch reached operating checks while work continued on the wider project. The site photographs show how the horizontal door, guides and separate perimeter guardrails fit around the lifting opening.
What to include in an enquiry
Lifting movement
Plans and sections showing the load, headroom, lifting route and clearances at each level.
Opening and adjacent structure
Surveyed levels, fixing surfaces, base design, access arrangements and guarding responsibilities.
Cleaning and exposure
Run-off paths, cleaning routines, chemicals, humidity and guide-cleaning access.
Testing and scope
Approved drawings, lifting interfaces, protective requirements, responsibilities and batch handover stages.
Questions about this configuration
Why was the door installed horizontally?
The process opening was in a floor, so the door had to travel across its plane. A normal vertical doorway would serve a different layout.
Why was the guide mounted on a raised base?
The project was designed to keep the guide installation away from direct floor run-off. The required height and drainage detail should be taken from the approved drawing for the site.
What does the photograph show?
It shows the horizontal slatted assembly, guide position and separate guardrails while work was still in progress.
How should opening protection be specified?
Provide the intended access, lifting and protection requirements to the responsible engineering team. Request project-specific technical verification for any claimed structural or fall-protection duty.
Coordinating a custom door around a vertical lifting opening?
Send a marked layout, opening dimensions, site photographs and your main operating requirement. SEPPES can review the door, mounting conditions and equipment interfaces with your project team.