Stacking and Rigid Spiral Doors for a Large-Opening Retrofit

A factory had large, wind-exposed openings used for regular material movement. Existing doors were binding and deforming, while much of the surrounding structure had to be retained. SEPPES replaced them with eight fabric stacking doors and three rigid spiral doors, coordinated with the openings and lifting access.

11-door retrofit5,000 × 4,500 mm openingsTwo door constructions
Grey fabric stacking door with lifting straps, horizontal reinforcement and a viewing strip
The installed fabric stacking door uses vertical lifting straps, horizontal reinforcement and a continuous viewing strip.
Portes empilables
8 fabric stacking doors
Rigid doors
3 rigid spiral doors
Project opening
5,000 × 4,500 mm
Remise en service
February 2025
THE PROJECT

The nominal size was the same. The operating brief varied by opening.

The existing conditions

The facility handled large industrial equipment and relied on truck and forklift access along exposed routes. The replacement team had to review wall fixings, space at the door head and the condition of the structure after removal.

The two configurations

Eight openings received fabric stacking doors with lifting straps and horizontal reinforcement. Three received rigid spiral doors with insulated slats. The layout was coordinated with the selected opening duties, traffic activation and the available mounting envelope.

PROJECT CONFIGURATION

Compare the complete assembly at each opening.

Design itemProject configurationWhat to confirm at your site
Fabric stacking doorsA reinforced flexible curtain with vertical lifting straps, a viewing strip and head enclosure.Provide the exposure and pressure requirements, floor-to-roof geometry and loaded vehicle dimensions.
Rigid spiral doorsInsulated aluminium slats and a spiral track arrangement at three openings.Review headroom, side projections, indicated thermal performance and access for maintenance.
Existing structureNew fixing and guide positions were coordinated after removing the former doors.Identify the supporting members and confirm who assesses substrate condition and repairs.
Traffic and nearby servicesThe package included radar and loop activation and coordination with air-curtain equipment at the head.Mark competing traffic, sensor positions and any work by the building or electrical contractor.
ENGINEERING DECISIONS

Use the exposure and supporting structure to guide the selection.

Compare by opening duty

Both configurations in this project share the same nominal opening size. The fabric stacking arrangement and the rigid spiral arrangement have different lifting paths, panels and installation envelopes. Start with the loads travelling through each opening and the conditions experienced on both sides.

Set out the replacement interfaces

Record the door travel, supporting members, overhead services and access needed during replacement. Where wind performance is specified, ask for evidence relevant to the offered dimensions, construction and installation. Use the project specification and approved drawings when deciding how the equipment will be assessed.

Silver rigid spiral door with insulated slats and a viewing strip at a factory opening
A rigid spiral door at another opening in the same retrofit uses rigid slats in place of a flexible curtain.
DELIVERY AND HANDOVER

Coordinate removal, fitting and operating checks.

  1. Survey the old openings

    The team reviewed headroom, guide positions, available structure and access before removal.

  2. Prepare the installation interfaces

    The former doors were removed and the mounting areas were prepared for the two new assemblies.

  3. Install and set up both door types

    The project combined mechanical installation, fabric lifting-strap adjustment and control checks across the 11 openings.

  4. Hand over the retrofit

    The 11-door scope was accepted on site in February 2025.

PROJECT OUTCOME

What the project delivered

The retrofit replaced the former doors with an opening-by-opening schedule. The two site photographs show the different door constructions in the same project and give buyers a visual starting point for comparing their own opening requirements.

PLAN YOUR PROJECT

What to include in an enquiry

Opening and fixings

Label each location. Measure clear width, height, side space, mounting members and nearby services.

Exposure and use

Describe weather exposure, pressure differences, loaded vehicle envelope and door cycle pattern.

Removal and access

Record current fixings and condition, access for lifting equipment and allowable closure times.

Control and handover

Mark requested activation points, traffic conflicts, operating modes and the project acceptance requirements.

COMMON BUYER QUESTIONS

Questions about this configuration

Why did the factory use two constructions?

The opening schedule combined an eight-door fabric stacking group and a three-door rigid spiral group. The conditions and duties at the individual openings informed the selections.

Can the same 5,000 × 4,500 mm specification be copied?

Use it as a comparison point. Confirm exposure, required performance, traffic, structure and the complete installed envelope for the offered product.

Can the previous guides and anchors be reused?

Have the existing structure and fixings assessed against the new door arrangement and installation loads. Agree who will provide any repairs or reinforcement.

When should the air-curtain interface be reviewed?

Include its support, air path and service access before setting out the door head. Agree the responsibilities for equipment, mounting and controls with the suppliers.

DISCUSS YOUR REQUIREMENTS

Replacing large doors at an exposed factory opening?

Send a marked layout, opening dimensions, site photographs and your main operating requirement. SEPPES can review the door, mounting conditions and equipment interfaces with your project team.