SEPPES PROJECT / INDUSTRIAL EMERGENCY RESPONSE

Full-View Sectional Doors for an Industrial Fire Station

An industrial fire station needed twelve full-view sectional doors for its vehicle bays. The design had to bring daylight into the garage, keep the overhead travel path clear and support a central dispatch opening command. SEPPES coordinated the track and fixing arrangements with the construction team and checked the door interface with the station controls during handover.

12 full-view doorsVehicle-bay clearancesCentral dispatch interface
Red-framed full-view sectional door raised beneath the concrete ceiling of an emergency vehicle bay
One full-view sectional door shown raised during installation, with the overhead track and concrete structure visible.
Door package
12 full-view sectional doors
Nominal opening
4,000 × 4,500 mm
Panel system
Aluminium frame and polycarbonate
Entrega
July 2025
THE PROJECT

Keep the vehicle exit clear when the doors are raised.

Visibility in the vehicle bays

The station needed daylight and a view through the doors when the bays were closed. The project specified red-finished aluminium framing with transparent polycarbonate sections. The two installation photographs show the red framing and how the raised door sections sit beneath the bay ceiling.

A shared opening command

The bay doors had to work with the station’s central dispatch controls as well as the local door controls. SEPPES coordinated the opening interface and fitted the overhead tracks around the available fixing and vehicle clearances.

PROJECT CONFIGURATION

Review the glazing, track profile and dispatch interface together.

Design itemProject configurationWhat to confirm at your site
Door groupTwelve full-view sectional doors for vehicle bays, specified at 4,000 × 4,500 mm.Check each opening separately, including the largest vehicle with roof-mounted equipment.
PanelsRed-finished aluminium frames and transparent polycarbonate panels in the project specification.Specify daylight, external visibility, surface finish and impact requirements for your facility.
Arranjo do trilhoSectional tracks turned from vertical travel into the overhead space beneath the concrete ceiling.Compare the raised panel position and track supports with services, lighting and vehicle travel paths.
ControlsCentral opening interface using dry contacts, coordinated with the station’s control team.Define which team supplies the request interface, status reporting, local controls and the acceptance procedure.
ENGINEERING DECISIONS

Treat each bay as part of a shared operating system.

Check clearances at each opening

A repeated design can still encounter variations in concrete edges and fixing surfaces. The teams reviewed the bays before fitting the tracks, then coordinated the supports and alignment with the building contractor. The photographs document this installation stage.

Agree the central opening interface

SEPPES coordinated a dry-contact opening interface with the station controls team. Commissioning included checking the local door response and the central operation. For another station, agree whether the command applies to all or selected bays and include the required operator feedback in the handover plan.

Two raised red-framed sectional doors beneath adjacent emergency vehicle bay ceilings during installation
Raised doors over adjacent vehicle bays during installation, showing how the track layouts fit the concrete bays.
DELIVERY AND HANDOVER

From prepared concrete bays to operating checks.

  1. Survey and coordination

    The construction team and SEPPES checked the prepared bays and clarified the fixing and clearance requirements.

  2. Door and track installation

    The installation team fitted the overhead tracks, assembled the door sections and aligned the bay doors.

  3. Interface and handover

    The teams checked door movement and the central control interface before the documented July 2025 handover.

PROJECT OUTCOME

What the project delivered

The garage received a twelve-door package with a coordinated overhead layout and a central opening interface for dispatch. The project brings together three decisions that buyers can check early. Confirm how much visibility the bays need, where each raised door fits, and who owns the interface to station controls.

PLAN YOUR PROJECT

What to include in an enquiry

Share the bay and vehicle schedule

Provide opening sizes, roof-mounted vehicle equipment heights, a section through the bay and the locations of lighting, services and structural fixing points.

Define the operating and handover roles

Identify the local and central controls, who supplies the control interface, which doors it operates and how the design team will check the door positions and protective functions.

COMMON BUYER QUESTIONS

Questions about this configuration

Why use full-view doors on emergency vehicle bays?

Transparent panels provide daylight and improve visibility across the opening while the door is closed. The glazing specification should match the exposure and operating requirements of the station.

What overhead dimensions matter?

Include the clear vehicle height, headroom, rear clearance, beam or slab level and the location of services. Check the position of the door sections when fully raised.

Can bay doors receive a central opening command?

This project coordinated the central opening request over a dry-contact interface. The station and door teams should agree the required behavior and checks for the specific control system.

How should fire-resistance requirements be specified?

List the required functions for each opening in the building door schedule. If the project requires a fire-resistance rating at a particular opening, have the building team specify and verify the approved assembly for that opening.

DISCUSS YOUR REQUIREMENTS

Send the vehicle-bay layout and dispatch requirements.

Send a marked layout, opening dimensions, site photographs and your main operating requirement. SEPPES can review the door, mounting conditions and equipment interfaces with your project team.