SEPPES PROJECTS

Industrial Door & Loading Dock Projects

See how SEPPES approaches real opening conditions, equipment interfaces and installation constraints—from cleanroom passages to factory entrances and warehouse loading areas.

Blue high-speed curtain door with a stainless-steel frame in a seafood processing passage
From a SEPPES seafood-processing project · Stainless-steel door frame and enclosure
Opening & Installation Planning

Clearances, mounting conditions and product selection.

Controls & Equipment Interfaces

Interlocking, activation and production-line signals.

Door & Dock Coordination

Equipment packages and project-specific delivery scope.

ENGINEERING THEMES

Start with the challenge at your opening.

Explore the design decisions that connect products, building conditions and operating requirements.

01 / CONTROLS

Automation & Interlocking

Door-to-door coordination, PLC signal requirements, access controls and vehicle activation. Define what the door must do and which system controls the sequence.

Read the Automation & Interlocking Guide →
02 / INSTALLATION

Custom Installation & Retrofit

Limited side space, overhead obstructions, mounting frames and existing openings. Review how the installation envelope influences the door layout.

Read the Installation & Retrofit Guide →
03 / PROJECT PACKAGES

Integrated Door & Dock Systems

Different entrances need different equipment. Coordinate door families, dock levelers, shelters and civil-work interfaces within the project scope.

Read the Door & Dock Systems Guide →
Working around a similar site constraint?

Share a site photo and the main operating requirement with SEPPES.

Discuss Your Project ↗
SEPPES ENGINEERING SUPPORT

Plan the product together with the installation.

A project recommendation needs to account for the opening, the operating environment and the teams responsible for the work.

01

Opening & Structure

Review clear opening dimensions, headroom, side clearance and fixing surfaces. Identify where a supporting frame or layout change may be needed.

02

Product & Materials

Match the door family, curtain or panel construction and enclosure materials to the passage, traffic pattern and environment.

03

Controls & Interfaces

Define activation methods, position feedback and required signal interfaces with the equipment integrator. Confirm the agreed control sequence before commissioning.

04

Delivery & Installation Scope

Coordinate drawings, site readiness and delivery stages. State which installation and commissioning tasks belong to SEPPES, the contractor or the equipment integrator.

COMPARE PROJECT CONDITIONS

Compare the conditions at your opening.

Start with the project that matches your application, then note the differences in traffic, clearances and environmental requirements.

Use the case configuration and linked engineering guides to prepare your own brief. Confirm installation and control responsibilities with the teams involved.

  • Application and trafficCompare the users, vehicles or material movement at the opening.
  • Opening and materialsReview usable clearance, mounting conditions and the operating environment.
  • Control relationshipsIdentify the systems exchanging requests, permissions and status.
  • Delivery responsibilityConfirm who supplies, installs, commissions and supports the package.
RELATED PRODUCTS

Find the right product family.

Use the project examples as a starting point, then compare the equipment options for your own opening.

Portas de Alta Velocidade

Explore curtain-door options for internal passages and equipment interfaces.

View High-Speed Doors →

Portas Seccionais

Review overhead door configurations and lifting arrangements for factory and warehouse openings.

View Sectional Doors →

Dock Levelers

Compare loading-platform configurations alongside pit and vehicle requirements.

View Dock Levelers →

Dock Shelters

Review shelter options together with vehicle dimensions and loading-bay geometry.

View Dock Shelters →
START YOUR PROJECT

From site information to an agreed scope.

STEP 01

Share the Opening

Send dimensions, site photos and the passage or loading task.

STEP 02

Review the Options

Discuss the product family, installation conditions and controls.

STEP 03

Confirm the Details

Agree on drawings, signal interfaces and each party's responsibilities.

STEP 04

Coordinate Delivery

Plan production, site readiness and the agreed handover requirements.

PROJECT QUESTIONS

Before you send a project enquiry.

Can a door be adapted to limited headroom or side clearance?

The installation envelope should be checked before a door is selected. Share the opening width and height, overhead and side clearances, fixing surfaces and nearby obstructions. The review can then consider motor position, track layout and any supporting frame required.

Can doors connect to PLCs or interlocking controls?

Project-specific interfaces can be defined for opening and closing commands, position feedback or door-to-door coordination. Available signals, operating logic and testing responsibilities must be agreed with the equipment integrator. Providing an interface does not by itself verify a machine-safety function.

Are these projects in China or overseas?

The featured examples are based on projects supplied or coordinated in China. Some equipment packages are supplied to Chinese OEMs for overseas end use. Each case should be read according to its stated supply, installation and commissioning scope.

What information should I send for a project recommendation?

Start with your country, application, opening dimensions and site photos. Add the expected traffic or operating frequency, environmental conditions and any required control interfaces. For a loading dock, include vehicle details, dock height and available pit information.

TELL US ABOUT YOUR OPENING

Bring your site conditions into the conversation.

Share the opening, the operating requirement and any installation or control constraints. SEPPES can help review suitable door and dock equipment options for your project.

Helpful details to prepare

  • Country, facility type and application
  • Opening width, height and installation clearances
  • Site photos or available drawings
  • Traffic, environment and control requirements
  • Project stage and expected schedule
For dock equipment, add vehicle dimensions, dock height and pit details.
Topo