Full-View Sectional Doors for an Industrial Fire Station
An industrial fire station needed twelve full-view sectional doors for its vehicle bays. The design had to bring daylight into the garage, keep the overhead travel path clear and support a central dispatch opening command. SEPPES coordinated the track and fixing arrangements with the construction team and checked the door interface with the station controls during handover.


- Door package
- 12 full-view sectional doors
- Nominal opening
- 4,000 × 4,500 mm
- Panel system
- Aluminium frame and polycarbonate
- Handover
- July 2025
Keep the vehicle exit clear when the doors are raised.
Visibility in the vehicle bays
The station needed daylight and a view through the doors when the bays were closed. The project specified red-finished aluminium framing with transparent polycarbonate sections. The two installation photographs show the red framing and how the raised door sections sit beneath the bay ceiling.
A shared opening command
The bay doors had to work with the station’s central dispatch controls as well as the local door controls. SEPPES coordinated the opening interface and fitted the overhead tracks around the available fixing and vehicle clearances.
Review the glazing, track profile and dispatch interface together.
| Design item | Project configuration | What to confirm at your site |
|---|---|---|
| Door group | Twelve full-view sectional doors for vehicle bays, specified at 4,000 × 4,500 mm. | Check each opening separately, including the largest vehicle with roof-mounted equipment. |
| Panels | Red-finished aluminium frames and transparent polycarbonate panels in the project specification. | Specify daylight, external visibility, surface finish and impact requirements for your facility. |
| Track arrangement | Sectional tracks turned from vertical travel into the overhead space beneath the concrete ceiling. | Compare the raised panel position and track supports with services, lighting and vehicle travel paths. |
| Controls | Central opening interface using dry contacts, coordinated with the station’s control team. | Define which team supplies the request interface, status reporting, local controls and the acceptance procedure. |
Treat each bay as part of a shared operating system.
Check clearances at each opening
A repeated design can still encounter variations in concrete edges and fixing surfaces. The teams reviewed the bays before fitting the tracks, then coordinated the supports and alignment with the building contractor. The photographs document this installation stage.
Agree the central opening interface
SEPPES coordinated a dry-contact opening interface with the station controls team. Commissioning included checking the local door response and the central operation. For another station, agree whether the command applies to all or selected bays and include the required operator feedback in the handover plan.


From prepared concrete bays to operating checks.
Survey and coordination
The construction team and SEPPES checked the prepared bays and clarified the fixing and clearance requirements.
Door and track installation
The installation team fitted the overhead tracks, assembled the door sections and aligned the bay doors.
Interface and handover
The teams checked door movement and the central control interface before the documented July 2025 handover.
What the project delivered
The garage received a twelve-door package with a coordinated overhead layout and a central opening interface for dispatch. The project brings together three decisions that buyers can check early. Confirm how much visibility the bays need, where each raised door fits, and who owns the interface to station controls.
What to include in an enquiry
Share the bay and vehicle schedule
Provide opening sizes, roof-mounted vehicle equipment heights, a section through the bay and the locations of lighting, services and structural fixing points.
Define the operating and handover roles
Identify the local and central controls, who supplies the control interface, which doors it operates and how the design team will check the door positions and protective functions.
Questions about this configuration
Why use full-view doors on emergency vehicle bays?
Transparent panels provide daylight and improve visibility across the opening while the door is closed. The glazing specification should match the exposure and operating requirements of the station.
What overhead dimensions matter?
Include the clear vehicle height, headroom, rear clearance, beam or slab level and the location of services. Check the position of the door sections when fully raised.
Can bay doors receive a central opening command?
This project coordinated the central opening request over a dry-contact interface. The station and door teams should agree the required behavior and checks for the specific control system.
How should fire-resistance requirements be specified?
List the required functions for each opening in the building door schedule. If the project requires a fire-resistance rating at a particular opening, have the building team specify and verify the approved assembly for that opening.
Send the vehicle-bay layout and dispatch requirements.
Send a marked layout, opening dimensions, site photographs and your main operating requirement. SEPPES can review the door, mounting conditions and equipment interfaces with your project team.